Conveying plant
We span roads.
The task
Conveying
A road separates the production and the shipping area. Due to the increasing traffic and the continuously increasing production numbers, a transport by forklift across the road is no longer the ideal solution.
The solution
An integrated bridge connects the two roadsides. On both sides a lifter was installed, each of which can accept two pallets. The transfer points are designed in such a way that they can be served by forklifts as well as hand pallet trucks.
The control engineering has been designed to transport the products from one side to the other and on the empties from shipment back to the production.
Facts & figures
Capacity: 720 pcs./day
Alztec Team:
2 EE in design
3 EE in assembly and commissioning
2 EE in electrics and control engineering
Main components:
60 m conveying track
2 lifters
1 rotary table
1 plant control incl. visualisation
Videos
Which task do you wish to come
true for your organization?
Let’s talk about your needs & requirements.
Just call or send us a mail.