Conveying plant
We span roads.
The task
Conveying
A road separates the production and the shipping area. Due to the increasing traffic and the continuously increasing production numbers, a transport by forklift across the road is no longer the ideal solution.
The solution
An integrated bridge connects the two roadsides. On both sides a lifter was installed, each of which can accept two pallets. The transfer points are designed in such a way that they can be served by forklifts as well as hand pallet trucks.
The control engineering has been designed to transport the products from one side to the other and on the empties from shipment back to the production.
Facts & figures
Capacity: 720 pcs./day
Alztec Team:
2 EE in design
3 EE in assembly and commissioning
2 EE in electrics and control engineering
Main components:
60 m conveying track
2 lifters
1 rotary table
1 plant control incl. visualisation
WHICH TASK DO YOU WISH TO COME
TRUE FOR YOUR ORGANIZATION?
Looking to optimize your production or solve a challenging process issue? We’re here to help.
Contact us today, and we’ll analyze your requirements and develop a tailor-made solution that perfectly fits your needs.
Let’s talk about your needs & requirements.
Just call or send aus a mail.
Head office
ALZTEC GmbH
Am Waltershamer Feld 12
83308 Trostberg
+49 8621 8061-0
info@alztec.com
Branch office
ALZTEC Service Corp.
9170 West Remus Road
Remus, MI, 49340 – USA
+1 (470) 861-6917
servicecorp@alztec.com

