Cross-plant
This is where the connection comes into play. Over 400 vehicles are moved per day.
What matters is the bottom line.
The Task
Conveying
Storage
Loading
Handling
In the automobile factory A, complete car bodies for SUV’s are produced. At factory B, these car bodies are completed with engines, driveline and exhaust systems to constitute the finished vehicle. The task was to bring the car bodies in the proper sequence as efficiently as possible from factory A to factory B.
The solution
From the factory production line continuously car bodies are transported to the shipping point, by the interaction of the 3 stacking modules and the 2 storage servicing equipment. The proper loading order for the train is established and stored temporarily in the warehouse for shipment. As soon as the train enters the station and is ready, the two loading cars start to displace the readied car bodies and fully automatically put them for loading into the train.
By installation of the loading plant, it was possible to increase the total output by 180 vehicles per day.
Facts & figures
Capacity: 420 pcs./day
Alztec team:
7 EE in design
12 EE in assembly / commissioning
8 EE in electrics / control engineering
Main components:
2 loading cars
2 storage servicing equipment
3 unstacking module for car bodies
50 storage slots for car bodies
1 plant control including visualization
1 storage management system
1 factory control linkage
Videos
Which task do you wish to come
true for your organization?
Let’s talk about your needs & requirements.
Just call or send us a mail.