Skip to main content

Fully automatic
rail loading

Save time on the tracks.
Heavy loads easily and
precisely loaded.

Schwerlast Ladewagen für Automatische Bahnverladung
Automatische Bahnverladung

The task

Unloading
Loading

An automotive plant is receiving battery modules by rail in stacks weighing up to five tons and shipping batteries in stacks weighing up to five tons. The plant’s requirement: fully automated unloading and reloading of the arriving mixed-freight trains comprising up to six railcars per train.

Automatische Bahnverladung

The solution

Alztec develops and supplies the self-loading railcar designed to unload stacks of modules or batteries in packs of 3 or 4 from the train and to reload the train with identical cargo. The system moves loads of up to 20 tons at a speed of up to 2.0 meters/second. The self-loading railcar features a loading device. The system is designed for fully automated unloading of approx. 250 stacks per day and fully automated reloading of approx. 250 stacks per day, in two shifts.

Elektrik automatische Bahnverladung

Facts and figures

250 stacks per day
Payload: 20 tons

Alztec team:
2 design & engineering staff
8 assembly & commissioning staff
2 electrical & control engineering staff

Main components:
1 self-loading railcar
170 metres of rail
1 safety features & equipment
1 plant control system including visualization

more about battery handling & logistics

Videos

Video Train loading

Video Train loading animation

back to the overview

WHICH TASK DO YOU WISH TO COME
TRUE FOR YOUR ORGANIZATION?

Looking to optimize your production or solve a challenging process issue? We’re here to help.
Contact us today, and we’ll analyze your requirements and develop a tailor-made solution that perfectly fits your needs.

Inquire now

Let’s talk about your needs & requirements.
Just call or send aus a mail.


08621 8061-0


info@alztec.com


Inquiry Form

LIKE IT

Head office

ALZTEC GmbH
Am Waltershamer Feld 12
83308 Trostberg
+49 8621 8061-0
info@alztec.com

Branch office

ALZTEC Service Corp.
9170 West Remus Road
Remus, MI, 49340 – USA
+1 (470) 861-6917
servicecorp@alztec.com

BVMW Mitgliedsunternehmen